Case Study
Fresh-Air & Energy Recovery for a Shopping Mall
IndustryShopping Mall
LocationWuhan, China
Scale180,000 m2 GFA
Year2024
Project Background
A large mall over-ventilated public areas, wasting energy heating and cooling huge volumes of outside air.
Our Solution
DNARENS CO2 transmitters drove demand-controlled fresh air, paired with plate heat-recovery units on the AHUs.
Results
Ventilation energy dropped 22% while indoor air quality stayed within green-building targets.
Need a Similar Solution?
Send us your project profile and our team will reply with a tailored proposal within 24 hours.