Case Study
Workshop Ventilation for an Automotive Plant
IndustryAutomotive Plant
LocationChongqing, China
Scale45,000 m2 / 6 workshops
Year2024
Project Background
A welding workshop faced fume buildup that triggered alarms and slowed production.
Our Solution
DNARENS controllers balanced local exhaust with tempered make-up air, interlocked to production shifts.
Results
Airborne particulate stayed under limits, and unplanned ventilation stops fell to zero over six months.
Need a Similar Solution?
Send us your project profile and our team will reply with a tailored proposal within 24 hours.